CONTACT US

ZHEJIANG KUNDE INNOVATE GEOTECHNICAL ENGINEERING CO.,LTD. 


Address: Room 801, Building B2, R & D Park, 999 Lane, Yangfan Road, Ningbo, Zhejiang Province

TEL:0574-83888192 

FAX:0574-83866694 

E-mail:zjkd@kundeyt.com


LOCATION:HOMEPAGE > NEWS > COMPANY NEWS
COMPANY NEWS
New technology, new technology, new patent
NOTETIME:2017-12-29 11:19:47 READ:1 TIMES
 

New technology, new technology, new patent

Hangzhou IKEA store anti-floating anchor bar project

Following the August 6, 2013, our company and China Jingye Engineering Co., Ltd. once again signed a "capsule expansion bolt" patent licensing contract, the leadership of my company decided to start a new home in Hangzhou, IKEA Technology The first victory of the victory for our company in Jiangsu, Zhejiang and Shanghai area to lay the foundation for the development.

Project Description:

The proposed project is located on the north side of Hangzhou Linping Ring Expressway, west of Qiaozhong Road, on the 01 Provincial Highway to the east and Boca Road on the north. The proposed building is a large shopping mall, with a plane size of about 216mx140m. It has a multi-layer frame structure and a mezzanine is partially installed. The top elevation of the roof is 20m. There is a basement, basement excavation depth of about 5m. Site safety system and quality inspection by the supervision and management company dual management.

In order to tie in with the total package work, the Company decided to shorten the planned construction period and increase the construction manpower and material resources. A total of 5 sets of high-pressure rotary jet grouting piles were put into operation, over 40 operators, In addition to send 11 managers, divided into day and night classes, 24-hour homework, plans to be completed within 1 month.

April 8, 2014, Hangzhou IKEA Mall anti-floating anchor project was officially started. On the same day, three test piles were successfully completed, and the pull-up value of 1300KN was reached in the subsequent pull-up test, approaching the acceptance of the pullout force

19-1.jpg

19-2.jpg

19-3.jpg

19-4.jpg

19-5.jpg

19-6.jpg

19-7.jpg

19-8.jpg